About us

With constructing of factories which meets the circle economic requirements and help for decarbonization process “BB Building” Ltd draw new horizons.

Putting into mass production the technology of “PV Sun”, which increases the production of electricity by 104%, BB Building Ltd is expected to take leading positions in the photovoltaic sector. Globally, there are no competitors that can provide so many technological solutions with so little space interaction, double efficiency and twice as fast return on investment. Currently “BB Building” Ltd. has put into operation “Factory 1”, located in the industrial zone of the village of Slanchevo.

History

The history of BB Building Ltd.

Team

The people responsible for the creation of the innovative dual axis tracker solar system - PV Sun system

FOR 10 YEARS THE PRODUCTION ACTIVITY WOULD SAVE ABOUT :

Tones of CO2 equivalent
10000

FACTORY 1 PROVIDES:

WORKING PLACES IN THE FACTORY
0 +
WORKING PLACES ON SITE
0 +
The factory is not subsidised by any EU, government or bank authority.
The factory activity will help the EU to achieve the 2050’ Green target.
The innovation of the construction would keep the biodiversity on sites.

The PV SUN SYSTEM project development will bring economical, ecological and
social long-term contribution on local, EU and worldwide level.

The implementation of a sustainable development production is the shortened
way to fait with the Global Warming.

The future still belongs to us!

The Sun can survive without us, but we can’t survive without it.

So, BELIEVE IN THE SUN!